Helical Pier Installation in Bellevue, WA

A Commercial Access Road in Need of Help

The Problem

As soon as Matvey Construction arrived on site, a failing allen block retaining wall was found with no drainage. 4 soil borings were then completed, and large pockets of highly mobile sandy soil were located. After temp shoring of the lock wall, Matvey completed a geo-tech report and permit design.

Helical Pier Installation in Bellevue, WA

The Solution

In order to fix this problem, complete soil density testing needed to be done. The client was supplied with a structural repair design permit set. A trench was then built for helical piers. Next, they were installed according to plans with a minimum 12-kip capacity to a minimum depth of 45 feet.

Matvey completed 3 load tests of 14-kips. Then, a 250 foot long, 30 inch by 30 inch grade beam was poured in tandem with the new structural slab. After this, movement monitors were installed and a 24 month chart was used to evaluate how well the installation will hold up years down the road.

The Results

Two years later, there was zero movement as reported by geo-tech tracking the site. The site is still perfectly level and plum.

Other Case Studies

Drainage System Installation
Helical Tieback Installation
Push Pier Installation